Austria
- HV test measurement of B105 / 220 kV at Tauern substation on June 2006
|
Belgium
- LCC Check and HV Test with UHF of B105 / 220 kV at WOLUWE substation on October 2006
- HV test measurement with Partial Discharge of B105 at Station Mobile 3 on November 2006
|
German
- HV test measurement with Partial Discharge of F35 at Forbach substation on 2006
|
ICELAND
- HV test with Partial Discharge of B105 / 220 kV at Colvidarholl substation on 2006
|
IRELAND
- HV test with Partial Discharge of B105 at Inchi Core substation on 2006
|
ITALY
- HV test measurement of B65 at Tavazzano substation on 2006
|
NORWAY
- Installation 1 extension bay of B65 at Troms Kraft Bardufoss substation on October 2008
|
SPAIN
- HV test measurement of B105 / 220 kV at Maragal substation on 2006
- HV test measurement of T155 at Litoral substation on 2006
- HV test measurement of B65 at Sam Estebans substation on 2006
- HV test measurement of B65 at Montebelo substation on 2006
- HV test measurement of B65 at Carboneras substation on 2006
- HV test measurement of B65 at Ejido substation on 2006
- HV test measurement of B65 at Avila Eber Drola substation on 2006
- HV test measurement of B65 at Risko Blanco substation on 2006
- HV test measurement of B65 at Endesa substation on 2006
- HV test measurement of B65 at Cantalezo substation on 2006
- HV test measurement of B65 at Deissa substation on 2006
- HV test measurement of B105 at Laselva substation on July 2006
- HV Test and training of B105 / 220 kV at El Palmar substation on April 2006
- HV Test of B105 / 220 kV at Oroya Nueva substation on May 2006
- LCC Check and HV Test with UHF of B105 / 220 kV at ELIA/NORELEC substation on 2006
|
SWEDEN
- Installing GIS B65 at Premraff Lysekil Sweden substation on July 2007
- HV Test Measurement and Partial Discharge of B65 at Majorstuen Transfo Stasjon on September 2007
- Installation of GIS type B65, Commissioning and HV Test at Dava substation - Umea on April 2008
|
SWITZERLAND
- Installation and testing of GIS type F35-3 at Bisisthal GIS 66 kV substation on November 2006
- LCC Check and HV Test with UHF at UW Riet Swiss substation on 2007
- Installation and testing of GIS type F35-3 / 72.5 kV at Ova Spin substation on March 2008
- Installation and testing of GIS type F35-3 at 4616 Kappel substation on October 2008
- Installation HV equipment and High Volt Test F35-4 at Ruopigeon substation on November 2008
|
UNITED KINGDOM
- HV Test Measurement of B65 at Lodge Road B 66 kV substation on July 2007
- HV test measurement with Partial Discharge of F35 at Bankside substation on 2007
|
PUERTO RICO
- Installation, Cable Connection and Commissioning test of F35-4 at Juncos substation on March 2009
|
BAHRAIN
- Commissioning of F35-3 / 72.5 kV at Furdhat Al Manama substation on July 2007
- Installation of GIS type F35-3 / 72.5 kV bay FWL 01, FWL 02, FWL 03 at Refinary substation - Riffa on October 2007
- Installation of GIS type F35-3 / 72.5 kV at Wadi Al Rifaa substation on November 2007
- Installation of GIS type F35-3 / 72.5 kV at Shamal Al Busaiteen substation - Manama on December 2007
- Installation and Commissioning of GIS type F35-3 at Gharb al Muharraq substation - Manama on January 2008
- Commissioning (CB timing test, LCC test, interlock test) of GIS type F35-3 at Shamal Al Busaiteen substation
on January 2008
- Installation and Commissioning of GIS type F35-3 at Karbabad substation - Manama on February 2008
- Installation of GIS type F35-3 at Al Sahel substation - Manama on June 2008
- Installation and commissioning of GIS type F35-3 at Lulu Island substation on August 2008
- Commission at Al Sahel substation - Manama on August 2008
- Installation and commissioning of GIS type F35-3 / 72.5 kV at Galali substation - Manama on November 2008
- Installation of GIS type F35-3 / 66 kV at Galali substation - Manama on February 2009
- Installation of GIS type F35-3 / 66 kV at Alsulwayfiyah substation - Manama on February 2009
- Installation of GIS type F35-3 / 66 kV at Wadi Al Sail substation - Manama on February 2009
- Installing and Dismantling HV Test Bushing of GIS type F35-3 / 66 kV at Bu Ghazal substation - Manama
on June 2009
- Dismantling HV Test Bushing of GIS type F35-3 / 66 kV at Galali substation - Manama on June 2009
- Installation of GIS type F35-3/ 66KV at Lulu Island substation on July 2009
- Installation of GIS type F35-3/ 66KV at BAPCO substation on November 2009
- Installation of GIS type F35-3/ 66KV at Gharb Al Muharraq substation on December 2009
- Installation of GIS type F35-3/ 66KV at Wadi Al Sahil substation on December 2009
- Installation of GIS type F35-3/ 66KV at Shamal Al Busaiteen substation on January 2010
|
EGYPT
- Installation and Commissioning of T155 / 500 kV at Borg El Arab substation on 2007
|
IRAN
- Installation and testing B65 at GIS 145 kV Mobin substation on August 2004
- HV test measurement with Partial Discharge of F35 at South Parsh substation on 2004
- HV test measurement with Partial Discharge of F35 at Ghaemsary substation on 2005
- Installation of Gas Insulated Substation at Pars Oil and Gas Company - Assaluyeh on May 2008
|
KUWAIT
- HV test of GIS, LCC commissioning, Gas tests, Installation of cable box links and gas treatment of B65
at Al Khiran 132 kV substation - Al Khiran on November 2007
- Installation of GIS primary of B65/132kV at Magwa “A” substation on February 2009
- Installation of GIS type B65/132kV at Sabriya“A” substation on March 2009
|
KINGDOM OF SAUDI ARABIA
- Installation and testing F35-2 and connecting to GMT 11 at Tabouk SS 4 Extension substation on August 2004
- Installation Cable Box Docking and HV Cable of B65 at Al-Rayyan substation - Dammam on August 2005
- Installation and Commissioning of DT-145 at Quraish substation on 2005
- Installation Cable Box and HV Test of B65 at KFUPM substation - Dammam on April 2006
- Replace Rupture Disk with new Type and Trouble shooting SF6 leakage of B65 at North Safaniyah substation
on February 2007
- Installation of GCB DT-2 / 400 kV at Al Fadhili substation on May 2008
- Installation and Commissioning CB DT-2 / 500 kV at Al Fadhili substation on June 2008
- Installation and Commissioning of F35 at Al Haramain substation on February 2009
- Installation and LV Works of GIS B65 / 132 kV at Namerah on March 2009
- HV Test and Installation of Bus Bar Links and Normalization of GIS B65 at Al Kudmi substation on March 2009
- Installation and Commissioning of F35-4 at Al Qumriah substation on March 2009
- Installation of GIS type B65 / 132 kV at Al Kudmi substation - Gizan on March 2009
- Installation and LV works of GIS B65 / 135 kV at Majardah substation on April 2009
- Replacement of the CTs bay E07, E15 and E21 and Installation of GIS B65 132 kV at Al Kudmi substation on April 2009
- Commissioning test, Coupling BB I and BB II to Existing of B65 (132 kV GIS) - T65 at Namerah substation on June 2009
- Installation and Commissioning of F35-4/ 132 kV at Al Shuqaiq substation on August 2009
|
OMAN
- Installation of 2 extension bay from F35 to F75 at Manah Extension substation on November 2008
- Installation of 2 extension bay from F35-4 to F75 with dielectric and LCC test at Manah Extension on January 2009
|
SYRIA
- Installation Extension B65 at Aleppo A Extension GIS 66 kV substation on April 2007
- Installation of GIS B65 at Baramkeh Extension GIS 66 kV substation - Damascus on April 2007
- Installation and Commissioning of GIS B65 at Baramkeh substation - Damascus on March 2008
- Installation and HV Test Measurement of GIS type B65 at Tishreen substation on April 2008
|
UNITED ARAB EMIRATES
- Installation and Testing of GIS B65 at W 47 - GIS 145 kV substation - Abu Dhabi on Mei 2004
- Installation and Commission of GIS type B65 at Bukadra substation - Dubai on Mei 2004
- Installation and Commission of GIS type B65 at E14 - GIS 132 kV substation - Abu Dhabi on August 2004
- Installation GIL Type T 155 and installation Of Cable Box at Bukadra substation - Dubai on August 2005
- Installation and Commission of GIS type B65; Installation of Cable Box and HV Cable Power at GIS 145 kV
at Jafza substation - Dubai on November 2005
- Installation and HV testing of GIS type B65 at GIS 145 kV Bukadra Extension substation - Dubai on 2006
- Installation and Testing of GIS type B65 at GIS 145 kV Jafza Extension substation - Dubai on April 2006
- Installation and Testing of T 155 at GIS 500 kV Jafza substation - Dubai on Mei 2006
- HV Test with Partial Discharge and UHF Measurement of GIS type B65 at GIS 145 kV Hora North substation - Dubai on 2007
- HV Test with Partial Discharge and UHF Measurement of GIS type B65 at GIS 145 kV Warqah substation - Dubai on 2007
- Installation of GIS type F35/4 of Fujairah RAK substation - Ras Al Khaemah on August 2007
- Installation and HV test of GIS type B65 at SEEF 132 kV substation - Dubai on August 2007
- Commissioning of GIS type B65 at Khawaneej 132 kV - Dubai on September 2007
|
QATAR
- Installation of Link Between Cable Box in B95 Equipment at New Doha J Substation - Doha on July 2006
- Installation and Commissioning of GIS type B105 at Ras Raffan substation on 2006
- Installation of GIS type B65 - 132 kV at Mesaieed substation on August 2009
- Installation of GIS type F35-3/ 66 kV at Abu Sidra North substation on September 2009
- Installation of GIS type F35-3/ 66 kV at Al Khissa substation on September 2009
- Installation of GIS type F35-3/ 66 kV at Mushreib 2 substation on Oktober 2009
- Installation of GIS type F35-3/ 66 kV at Umm Al Amad Super substation on December 2009
- Installation of GIS type F35-4/ 132 kV at Umm Birka Super substation on December 2009
|
SOUTH AFRICA
- Installation and Commissioning of B65 at For Shore substation on 2006
|
BRUNEI DARUSSALAM
- Gas purity test quality and Contact Resistance Measurement of CB DT-09 / 72,5 kV at NEW 66 kV BMC/DES SWITCHYARD on April 2009
|
CHINA
- Installation and Commissioning of HGF-1014 at Daqing DT 220 kV on March 2007
- Installation and Commissioning of T155 / 220 kV at Mawan substation on 2006
- Installation and Commissioning of B105 / 220 kV at Shong Yu substation on 2006
- Replacement Spring Mechanism (Retrofit CB) of DT-2 / 500 kV at Hong He SS 500 kV substation on June 2007
- Replacement Spring Mechanism of DT-17 / 500 kV at Suzhou China Southern Power Grid on November 2007
- Repair Leak and Docking Cable F35 at GIS 145 kV Wuhai substation on November 2006
- Installation of GIS type B95-4 at GIS 220 kV Yingkou substation on November 2006
- Installation and Commissioning of T155 / 500 kV at Daya Bay substation on 2006
- Maintenance of Hydraulic Mechanism CB DT-17 GCB 550KV at Honghe S/S 550 kV-China Southern Power Grid on July 2007
- Replacement DT-17 Spring Mechanism GCB 550 kV at Feixi substation - Hefei on December 2007
- Installation DT GCB 550 Kv at Teiling 500 kV Power Plant - Shenyang on February 2008
- Retrofit DT GCB 550 Kv at Yuxi substation on March 2008
- Replacement Spring Mechanism of DT GCB 550 kV at Andling substation on April 2008
- Installation, commissioning and dielectric test of GIS type B65 at Cotai GIS 66 kV - MACAU on January 2008
- Installation, commissioning and dielectric test of GIS type B65 at Cotai GIS 110 kV - MACAU on January 2008
|
INDIA
- Installation and Commissioning at GIS 145 kV LARGI substation on March 2006
|
INDONESIA
- Installation, Testing and HV Test at GIS 150 kV Gandaria substation - Jakarta on January 2005
- Trouble Shooting sealing end Cable Box of GIS type B65 at Pondok Kelapa substation - Jakarta on October 2006
- Installation and Testing of Gas Insulated Substation 150 kV type B65 at GIS 150 kV Gandaria substation - Jakarta on July 2005
- Inspection of existing B95 material in PLN store at GIS 150 kV Gandaria Ext 1 - Jakata on January 2005
- Installing coupling capasitor for PD Monitoring of B65 at PLTU Semarang on April 2007
- Installation of Link Cable Box and VT of B65 at Pegangsaan - Jakarta on November 2007
- Installation and Commissioning of Dead Tank 44 kV FK 3-1 DT09 at PT. Chevron Pacific Indonesia - Riau on December 2007
- Installation and Commissioning of Dead Tank 123 kV FK 3-1 DT1-145 F1 FK at PT. Chevron Pacific Indonesia - Riau on January 2008
- HV test surge arrester of T155 at GIS 500 kV Suralaya - Cilegon on September 2008
- Normalizing Bay Transformer, Bus Coupler and Busbar of B65 after Flashover at GIS 150 kV Darmo Grande - Surabaya on September 2008
- HV test surge arrester at GI 500 kV Kembangan - Jakarta on September 2009
- Installation of AIS 150 kV at Bogor Baru Substation on February 2010
- Installation of AIS 150 kV at Lembur Situ Substation on February 2010
- Installation of AIS 150 kV at Cibadak Substation on March 2010
- Installation of AIS and GIS 500 kV at Paiton Substation on March 2010
- Installation of AIS 150 kV at Ciawi Substation on April 2010
- Installation of AIS 150 kV at Cianjur Substation on April 2010
|
MALAYSIA
- Commissioning, Preparation and UHF Measurement in TNB S/S of B105 / 275 kV at Skudai, Pergau on May 2006
|
SINGAPORE
- HV test measurement of T105 / 220 kV at Tampines substation on 2007
|
THAILAND
- Installation of dead tank circuit breaker of HGF14 at Kaeng Khoi 2- 230 kV substation - Saraburi on March 2006
- Installation and Testing GIS type B65 at Thanontok substation - Bangkok on July 2006
- HV Test with Partial Discharge of GIS type B65 at Vibhadi substation on September 2006
|
VIETNAM
- Installation, Modification and Testing GIS type B95-3 at So Thus GIS 110 kV substation - Ho Chi Minh on August 2008
|
TUNISIA
- HV test measurement of GIS type B65 at STEG Tunis Nord substation on 2006
- Installation and Commissioning of GIS type B65 at Tunis Ouest substation on April 2008
- Installation of VT and Re-arrange cable box support of GIS type B65 at M'nihla substation on May 2008
- Repair the SF6 gas leakage at G9 compartment of GIS type B65 at Tunis Nord substation on May 2008
- Installation and Testing of GIS type B105 at Borj Cedria substation on June 2008
- Repairing work after flash over of GIS type B65 at Menzel Bourguiba substation - Rades on August 2008
- Installation and Commissioning of GIS type B65/90 kV at Ain Kmich substation on October 2009
|